Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 7 results ...

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(01), 62-76.

Carreira, P, Castelo, T, Gomes, C C, Ferreira, A, Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(01), 90-112.

Gerbov, A, Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(01), 2-20.

  • Type: Journal Article
  • Keywords: design management; methodology; case study; building information modelling
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-12-2016-0260
  • Abstract:
    Purpose The purpose of this paper is to present a reflective assessment on a research project aimed at applying design research methodologies to understand the benefits of building information modelling (BIM) in infrastructure design projects, a context where design research has not been applied adequately. Design/methodology/approach The findings reported in this paper are based on a reflective diary and reporting by the researchers on the challenges and barriers they faced in a research project that involved four case studies. The data in the case studies were collected from project documentation, questionnaire surveys, interviews and workshops. Sentiment analysis was conducted to assess the research participants’ perceptions. Findings Several challenges faced during the research study forced changes to the research process as well as adjustments to the research objectives. From the original objective of quantitatively measuring the benefits of BIM in the design process, the objective was shifted to measuring qualitatively how the designers’ perceived the benefits. There was evident lack of shared understanding between the researchers and industry partners about the scope of design research and design in infrastructure projects. Research limitations/implications The findings are based on the studies in one country, and the reflective assessment could have researchers’ bias in terms of their interpretation and experience. Practical implications The presented findings and the lessons learnt from the research will be useful for others planning to conduct similar studies, because they are likely to encounter similar problems. The recommendations will benefit both the industry as well as the academia in bridging the gap between design theory and practice. Originality/value This paper primarily focusses on the challenges and barriers to conducting empirical research, especially from the viewpoints of a young researcher aiming to adopt design research methodology in infrastructure design projects. While the reported challenges may be widespread in similar research projects, they have not been the focus of research themselves, and are often sidelined. The primary contribution of this research is to identify and bring the key barriers and challenges to the forefront.

Hatamleh, M T, Hiyassat, M, Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(01), 113-31.

Lian, J K M, Foo, Z Y and Ling, F Y Y (2018) Value of internships for professional careers in the built environment sector in Singapore. Engineering, Construction and Architectural Management, 25(01), 77-89.

Lingard, H, Blismas, N, Harley, J, Stranieri, A, Zhang, R P and Pirzadeh, P (2018) Making the invisible visible: Stimulating work health and safety-relevant thinking through the use of infographics in construction design. Engineering, Construction and Architectural Management, 25(01), 39-61.

Ma, L, Reed, R and Jin, X (2018) Identify the equilibrium of residential construction output: A vector error correction model approach. Engineering, Construction and Architectural Management, 25(01), 21-38.